12 Mar 2019 POSTED BY: ADMIN
For the last few years Red Rock Geo have been Geotechnical consultants to Mid and East Antrim Borough Council leading the works to reopen the Gobbins Coastal Walkway in Northern Ireland.
11 Apr 2019 POSTED BY: ADMIN
Red Rock undertook ground investigations and inspections of a section of cliff to provide a design for the slope stabilisation of a coastal cliff section.
30 Jun 2017 POSTED BY: ADMIN
Red Rock have undertaken many larger slope stabilisation schemes for commercial premises and developments.
30 Jun 2017 POSTED BY: ADMIN
Red Rock uses statistical risk assessment techniques to ascertain the necessity and proportionality of any slope stabilisation measures to the level of instability risk.
11 Apr 2019 POSTED BY: ADMIN
Ground investigation, slope assessment, and stabilisation design for a new private property.
30 Jun 2017 POSTED BY: ADMIN
Red Rock have been involved in the ground investigations and assessments of some of the tallest buildings in the South West.
11 Apr 2019 POSTED BY: ADMIN
Red Rock undertook the slope stabilisation design required to improve, to acceptable levels, the stability condition of a former quarry slope at the rear of building property.
12 Apr 2019 POSTED BY: ADMIN
Red Rock undertook a ground investigation for foundation and slope stability design for the re-development of a residential property at St Agnes.
30 Jun 2017 POSTED BY: ADMIN
Following recent winter storms, the issue of coastal stability has come to the fore.
12 Apr 2019 POSTED BY: ADMIN
Red Rock were appointed to design, direct, and verify the stabilisation works for a cut slope at a residential property.
11 Apr 2019 POSTED BY: ADMIN
Red Rock completed a slope stability assessment for different slope sections and developed a soil nail design to improve their stability.
12 Apr 2019 POSTED BY: ADMIN
Red Rock was asked to provide an assessment and stabilisation design for a rock face prior to the construction of a new private residential dwelling.
30 Jun 2017 POSTED BY: ADMIN
Land instabilities can sometimes be of a scale that common slope stabilisation measures, are impractical to implement.