11 Apr 2019 POSTED BY: ADMIN
Red Rock have been geotechnical consultants for the £14m redevelopment of the historic Victorian fort of Fort Bovisand lying on the eastern approaches to Plymouth Sound.
11 Apr 2019 POSTED BY: ADMIN
Red Rock undertook ground investigations and inspections of a section of cliff to provide a design for the slope stabilisation of a coastal cliff section.
12 Mar 2019 POSTED BY: ADMIN
A new student village at East Park for the University of Exeter comprising 11 tower blocks of student accommodation and commercial premises.
11 Apr 2019 POSTED BY: ADMIN
Ground investigation, slope assessment, and stabilisation design for a new private property.
30 Jun 2017 POSTED BY: ADMIN
Red Rock have been involved in the ground investigations and assessments of some of the tallest buildings in the South West.
11 Apr 2019 POSTED BY: ADMIN
Red Rock undertook the slope stabilisation design required to improve, to acceptable levels, the stability condition of a former quarry slope at the rear of building property.
12 Apr 2019 POSTED BY: ADMIN
Red Rock undertook a ground investigation for foundation and slope stability design for the re-development of a residential property at St Agnes.
12 Apr 2019 POSTED BY: ADMIN
Red Rock were appointed to design, direct, and verify the stabilisation works for a cut slope at a residential property.
11 Apr 2019 POSTED BY: ADMIN
Red Rock completed a slope stability assessment for different slope sections and developed a soil nail design to improve their stability.
12 Apr 2019 POSTED BY: ADMIN
Red Rock was asked to provide an assessment and stabilisation design for a rock face prior to the construction of a new private residential dwelling.